0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Saeed, Fam / Mostafa, Kareem / Rausch, Christopher / Hegazy, Tarek (2023): Environmental Impact and Cost Assessment for Reusing Waste during End-of-Life Activities on Building Projects. In: Journal of Construction Engineering and Management, v. 149, n. 10 (October 2023).

    https://doi.org/10.1061/jcemd4.coeng-12943

  2. Mostafa, Kareem Tarek / Ojulari, Sayeeda / Hegazy, Tarek (2023): Enhanced Repetitive Scheduling Formulation for Meeting Deadlines and Resource Constraints in Linear and Scattered Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 March 2023).

    https://doi.org/10.1139/cjce-2022-0029

  3. Hegazy, Tarek / Saad, Dina A. (2013): A microeconomic perspective on infrastructure rehabilitation. In: Construction Management and Economics, v. 32, n. 5 (April 2013).

    https://doi.org/10.1080/01446193.2013.879193

  4. Bhih, Moneer / Hegazy, Tarek (2021): Enhanced Daily Windows Delay-Analysis Technique. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (August 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000475

  5. Bhih, Moneer / Hegazy, Tarek (2020): Improving Concurrency Assessment and Resolving Misconceptions about But-For Delay Analysis Technique. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (May 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000378

  6. Rashedi, Roozbeh / Hegazy, Tarek (2016): Holistic Analysis of Infrastructure Deterioration and Rehabilitation Using System Dynamics. In: Journal of Infrastructure Systems, v. 22, n. 1 (March 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000273

  7. Hegazy, Tarek / Moselhi, Osama (1994): Estimator: a prototype of an integrated bid preparation system. In: Engineering, Construction and Architectural Management, v. 1, n. 1 (January 1994).

    https://doi.org/10.1108/eb020992

  8. Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina Atef (2014): Framework for enhanced progress tracking and control of linear projects. In: Engineering, Construction and Architectural Management, v. 21, n. 1 (January 2014).

    https://doi.org/10.1108/ecam-08-2012-0080

  9. Hegazy, Tarek / Mostafa, Kareem / Esnaashary Esfahani, Mansour (2020): Hands-On Class Exercise for Efficient Planning and Execution of Modular Construction. In: Journal of Civil Engineering Education, v. 146, n. 3 (July 2020).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000012

  10. Hegazy, Tarek / Saad, Dina A. / Mostafa, Kareem (2020): Enhanced Repetitive-Scheduling Computation and Visualization. In: Journal of Construction Engineering and Management, v. 146, n. 10 (October 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001911

  11. Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. In: Journal of Management in Engineering (ASCE), v. 20, n. 1 (January 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)

  12. Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)

  13. Hegazy, Tarek / Rashedi, Roozbeh (2013): Large-Scale Asset Renewal Optimization Using Genetic Algorithms plus Segmentation. In: Journal of Computing in Civil Engineering, v. 27, n. 4 (July 2013).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000249

  14. Menesi, Wail / Golzarpoor, Behrooz / Hegazy, Tarek (2013): Fast and Near-Optimum Schedule Optimization for Large-Scale Projects. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000722

  15. Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina A. / Rashedi, Roozbeh (2013): Hands-On Exercise for Enhancing Students' Construction Management Skills. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000705

  16. Zaneldin, Essam / Hegazy, Tarek / Grierson, Donald (2001): Improving Design Coordination for Building Projects. II: A Collaborative System. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(330)

  17. Hegazy, Tarek / Zaneldin, Essam / Grierson, Donald (2001): Improving Design Coordination for Building Projects. I: Information Model. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:4(322)

  18. Mbabazi, Anania / Hegazy, Tarek / Saccomanno, Frank (2005): Modified But-For Method for Delay Analysis. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1142)

  19. Abdel-Monem, Mohamed / Hegazy, Tarek (2013): Enhancing Construction As-Built Documentation Using Interactive Voice Response. In: Journal of Construction Engineering and Management, v. 139, n. 7 (July 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000648

  20. Hegazy, Tarek / Menesi, Wail (2012): Heuristic Method for Satisfying Both Deadlines and Resource Constraints. In: Journal of Construction Engineering and Management, v. 138, n. 6 (June 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000483

  21. Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. In: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (March 2001).

    https://doi.org/10.1111/0885-9507.00215

  22. Hegazy, Tarek / Said, Mohamed / Kassab, Moustafa (2011): Incorporating rework into construction schedule analysis. In: Automation in Construction, v. 20, n. 8 (December 2011).

    https://doi.org/10.1016/j.autcon.2011.04.006

  23. Elhakeem, Ahmed / Hegazy, Tarek (2005): Graphical Approach for Manpower Planning in Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 131, n. 2 (February 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:2(168)

  24. Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)

  25. Hegazy, Tarek / Petzold, Kevin (2003): Genetic Optimization for Dynamic Project Control. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(396)

  26. Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. In: Structure and Infrastructure Engineering, v. 3, n. 1 (March 2007).

    https://doi.org/10.1080/15732470500254535

  27. Rashedi, Roozbeh / Hegazy, Tarek (2016): Examining budget policies for new and existing facilities: a system dynamics approach. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 6 (June 2016).

    https://doi.org/10.1139/cjce-2015-0486

  28. Hegazy, Tarek / Menesi, Wail (2012): Enhancing the critical path segments scheduling technique for project control. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).

    https://doi.org/10.1139/l2012-024

  29. Elbehairy, Hatem / Hegazy, Tarek / Soudki, Khaled (2009): Integrated Multiple-Element Bridge Management System. In: Journal of Bridge Engineering (ASCE), v. 14, n. 3 (May 2009).

    https://doi.org/10.1061/(asce)1084-0702(2009)14:3(179)

  30. Abuwarda, Zinab / Hegazy, Tarek (2016): Flexible Activity Relations to Support Optimum Schedule Acceleration. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001193

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine