0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Mostafa, Kareem Tarek / Ojulari, Sayeeda / Hegazy, Tarek (2023): Enhanced Repetitive Scheduling Formulation for Meeting Deadlines and Resource Constraints in Linear and Scattered Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 March 2023).

    https://doi.org/10.1139/cjce-2022-0029

  2. Al-Saggaf, Abdullah / Hegazy, Tarek / Nasir, Hassan / Taha, Mahmoud (2022): Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. In: Architectural Engineering and Design Management, v. 18, n. 5 (March 2022).

    https://doi.org/10.1080/17452007.2021.1941740

  3. Bhih, Moneer / Hegazy, Tarek (2021): Enhanced But-For Method to Apportion Net Delays and Accelerations. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002094

  4. Bhih, Moneer / Hegazy, Tarek (2021): Enhanced Daily Windows Delay-Analysis Technique. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (August 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000475

  5. Mostafa, Kareem / Attalla, Ahmed / Hegazy, Tarek (2021): Data mining of school inspection reports to identify the assets with top renewal priority. In: Journal of Building Engineering, v. 41 (September 2021).

    https://doi.org/10.1016/j.jobe.2021.102404

  6. Yousefi, Saied / Hipel, Keith W. / Hegazy, Tarek (2010): Considering Attitudes in Strategic Negotiation over Brownfield Disputes. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (November 2010).

    https://doi.org/10.1061/(asce)la.1943-4170.0000034

  7. Binhomaid, Omar / Hegazy, Tarek (2021): Agent-based Simulation of Workers’ Behaviors, Productivity, and Safety around Construction Obstacles. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 8 (August 2021).

    https://doi.org/10.1139/cjce-2019-0320

  8. Al-Saggaf, Abdullah / Nasir, Hassan / Hegazy, Tarek (2020): An Analytical Hierarchy Process-based system to evaluate the life-cycle performance of buildings at early design stage. In: Journal of Building Engineering, v. 31 (September 2020).

    https://doi.org/10.1016/j.jobe.2020.101364

  9. Saad, Dina A. / Hegazy, Tarek (2015): Behavioral Economic Concepts for Funding Infrastructure Rehabilitation. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000332

  10. Yousefi, Saied / Hipel, Keith W. / Hegazy, Tarek (2010): Attitude-Based Negotiation Methodology for the Management of Construction Disputes. In: Journal of Management in Engineering (ASCE), v. 26, n. 3 (July 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000013

  11. Hegazy, Tarek / Gad, Walaa (2015): Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000351

  12. Hegazy, Tarek / Moselhi, Osama (1994): Analogy‐Based Solution to Markup Estimation Problem. In: Journal of Computing in Civil Engineering, v. 8, n. 1 (January 1994).

    https://doi.org/10.1061/(asce)0887-3801(1994)8:1(72)

  13. Hegazy, Tarek / Shabeeb, Abdul Karim / Elbeltagi, Emad / Cheema, Tariq (2000): Algorithm for Scheduling with Multiskilled Constrained Resources. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(414)

  14. Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1993): DBID: Analogy‐Based DSS for Bidding in Construction. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:3(466)

  15. Hegazy, Tarek / Wassef, Nagib (2001): Cost Optimization in Projects with Repetitive Nonserial Activities. In: Journal of Construction Engineering and Management, v. 127, n. 3 (June 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:3(183)

  16. Kassab, Moustafa / Hegazy, Tarek / Hipel, Keith (2010): Computerized DSS for Construction Conflict Resolution under Uncertainty. In: Journal of Construction Engineering and Management, v. 136, n. 12 (December 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000239

  17. Kassab, Moustafa / Hipel, Keith / Hegazy, Tarek (2006): Conflict Resolution in Construction Disputes Using the Graph Model. In: Journal of Construction Engineering and Management, v. 132, n. 10 (October 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1043)

  18. Hegazy, Tarek (2006): Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(26)

  19. Elbeltagi, Emad / Hegazy, Tarek / Eldosouky, Adel (2004): Dynamic Layout of Construction Temporary Facilities Considering Safety. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(534)

  20. Hegazy, Tarek / Elhakeem, Ahmed / Elbeltagi, Emad (2004): Distributed Scheduling Model for Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(160)

  21. Elbehairy, Hatem / Elbeltagi, Emad / Hegazy, Tarek / Soudki, Khaled (2006): Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00458.x

  22. Hegazy, Tarek / Abdel-Monem, Mohamed (2012): Email-based system for documenting construction as-built details. In: Automation in Construction, v. 24 (July 2012).

    https://doi.org/10.1016/j.autcon.2012.02.014

  23. Hegazy, Tarek / Zhang, Kehui (2005): Daily Windows Delay Analysis. In: Journal of Construction Engineering and Management, v. 131, n. 5 (May 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:5(505)

  24. Hegazy, Tarek / Menesi, Wail (2008): Delay Analysis under Multiple Baseline Updates. In: Journal of Construction Engineering and Management, v. 134, n. 8 (August 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:8(575)

  25. Hegazy, Tarek / Menesi, Wail (2010): Critical Path Segments Scheduling Technique. In: Journal of Construction Engineering and Management, v. 136, n. 10 (October 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000212

  26. Hegazy, Tarek / Kamarah, Ehab (2008): Efficient Repetitive Scheduling for High-Rise Construction. In: Journal of Construction Engineering and Management, v. 134, n. 4 (April 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:4(253)

  27. Rashedi, Roozbeh / Hegazy, Tarek (2015): Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. In: Structure and Infrastructure Engineering, v. 11, n. 3 (November 2015).

    https://doi.org/10.1080/15732479.2013.866968

  28. Elhakeem, Ahmed / Hegazy, Tarek (2012): Building asset management with deficiency tracking and integrated life cycle optimisation. In: Structure and Infrastructure Engineering, v. 8, n. 8 (August 2012).

    https://doi.org/10.1080/15732471003777071

  29. Saad, Dina A. / Hegazy, Tarek (2017): Economic optimization for the rehabilitation of co-located mixed assets. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 10 (October 2017).

    https://doi.org/10.1139/cjce-2016-0509

  30. Saad, Dina A. / Hegazy, Tarek (2015): Enhanced benefit–cost analysis for infrastructure fund allocation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 42, n. 2 (February 2015).

    https://doi.org/10.1139/cjce-2014-0281

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine