-
Hegazy, Tarek / Elbeltagi, Emad / El-Behairy, Hatem (2004): Bridge Deck Management System with Integrated Life-Cycle Cost Optimization. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1866, n. 1 (Januar 2004).
https://doi.org/10.3141/1866-06
-
Suliman, Ala / Liu, Zheng / Hegazy, Tarek (2024): Capturing and modeling reality to enhance the built environment. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 51, n. 4 (April 2024).
https://doi.org/10.1139/cjce-2024-0027
-
Al-Saggaf, Abdullah / Hegazy, Tarek / Nasir, Hassan / Taha, Mahmoud (2022): Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. In: Architectural Engineering and Design Management, v. 18, n. 5 (März 2022).
https://doi.org/10.1080/17452007.2021.1941740
-
Bhih, Moneer / Hegazy, Tarek (2021): Enhanced But-For Method to Apportion Net Delays and Accelerations. In: Journal of Construction Engineering and Management, v. 147, n. 7 (Juli 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002094
-
Mostafa, Kareem / Attalla, Ahmed / Hegazy, Tarek (2021): Data mining of school inspection reports to identify the assets with top renewal priority. In: Journal of Building Engineering, v. 41 (September 2021).
https://doi.org/10.1016/j.jobe.2021.102404
-
Yousefi, Saied / Hipel, Keith W. / Hegazy, Tarek (2010): Considering Attitudes in Strategic Negotiation over Brownfield Disputes. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (November 2010).
https://doi.org/10.1061/(asce)la.1943-4170.0000034
-
Binhomaid, Omar / Hegazy, Tarek (2021): Agent-based Simulation of Workers’ Behaviors, Productivity, and Safety around Construction Obstacles. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 8 (August 2021).
https://doi.org/10.1139/cjce-2019-0320
-
Al-Saggaf, Abdullah / Nasir, Hassan / Hegazy, Tarek (2020): An Analytical Hierarchy Process-based system to evaluate the life-cycle performance of buildings at early design stage. In: Journal of Building Engineering, v. 31 (September 2020).
https://doi.org/10.1016/j.jobe.2020.101364
-
Saad, Dina A. / Hegazy, Tarek (2015): Behavioral Economic Concepts for Funding Infrastructure Rehabilitation. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000332
-
Yousefi, Saied / Hipel, Keith W. / Hegazy, Tarek (2010): Attitude-Based Negotiation Methodology for the Management of Construction Disputes. In: Journal of Management in Engineering (ASCE), v. 26, n. 3 (Juli 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000013
-
Hegazy, Tarek / Gad, Walaa (2015): Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015).
https://doi.org/10.1061/(asce)cp.1943-5487.0000351
-
Hegazy, Tarek / Moselhi, Osama (1994): Analogy‐Based Solution to Markup Estimation Problem. In: Journal of Computing in Civil Engineering, v. 8, n. 1 (Januar 1994).
https://doi.org/10.1061/(asce)0887-3801(1994)8:1(72)
-
Hegazy, Tarek / Shabeeb, Abdul Karim / Elbeltagi, Emad / Cheema, Tariq (2000): Algorithm for Scheduling with Multiskilled Constrained Resources. In: Journal of Construction Engineering and Management, v. 126, n. 6 (Dezember 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:6(414)
-
Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1993): DBID: Analogy‐Based DSS for Bidding in Construction. In: Journal of Construction Engineering and Management, v. 119, n. 3 (September 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:3(466)
-
Hegazy, Tarek / Wassef, Nagib (2001): Cost Optimization in Projects with Repetitive Nonserial Activities. In: Journal of Construction Engineering and Management, v. 127, n. 3 (Juni 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:3(183)
-
Kassab, Moustafa / Hegazy, Tarek / Hipel, Keith (2010): Computerized DSS for Construction Conflict Resolution under Uncertainty. In: Journal of Construction Engineering and Management, v. 136, n. 12 (Dezember 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000239
-
Kassab, Moustafa / Hipel, Keith / Hegazy, Tarek (2006): Conflict Resolution in Construction Disputes Using the Graph Model. In: Journal of Construction Engineering and Management, v. 132, n. 10 (Oktober 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1043)
-
Hegazy, Tarek (2006): Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs. In: Journal of Construction Engineering and Management, v. 132, n. 1 (Januar 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:1(26)
-
Elbeltagi, Emad / Hegazy, Tarek / Eldosouky, Adel (2004): Dynamic Layout of Construction Temporary Facilities Considering Safety. In: Journal of Construction Engineering and Management, v. 130, n. 4 (August 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(534)
-
Hegazy, Tarek / Elhakeem, Ahmed / Elbeltagi, Emad (2004): Distributed Scheduling Model for Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:2(160)
-
Elbehairy, Hatem / Elbeltagi, Emad / Hegazy, Tarek / Soudki, Khaled (2006): Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).
https://doi.org/10.1111/j.1467-8667.2006.00458.x
-
Hegazy, Tarek / Abdel-Monem, Mohamed (2012): Email-based system for documenting construction as-built details. In: Automation in Construction, v. 24 (Juli 2012).
https://doi.org/10.1016/j.autcon.2012.02.014
-
Hegazy, Tarek / Zhang, Kehui (2005): Daily Windows Delay Analysis. In: Journal of Construction Engineering and Management, v. 131, n. 5 (Mai 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:5(505)
-
Hegazy, Tarek / Menesi, Wail (2008): Delay Analysis under Multiple Baseline Updates. In: Journal of Construction Engineering and Management, v. 134, n. 8 (August 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:8(575)
-
Hegazy, Tarek / Menesi, Wail (2010): Critical Path Segments Scheduling Technique. In: Journal of Construction Engineering and Management, v. 136, n. 10 (Oktober 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000212
-
Hegazy, Tarek / Kamarah, Ehab (2008): Efficient Repetitive Scheduling for High-Rise Construction. In: Journal of Construction Engineering and Management, v. 134, n. 4 (April 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:4(253)
-
Rashedi, Roozbeh / Hegazy, Tarek (2015): Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. In: Structure and Infrastructure Engineering, v. 11, n. 3 (November 2015).
https://doi.org/10.1080/15732479.2013.866968
-
Elhakeem, Ahmed / Hegazy, Tarek (2012): Building asset management with deficiency tracking and integrated life cycle optimisation. In: Structure and Infrastructure Engineering, v. 8, n. 8 (August 2012).
https://doi.org/10.1080/15732471003777071
-
Saad, Dina A. / Hegazy, Tarek (2017): Economic optimization for the rehabilitation of co-located mixed assets. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 10 (Oktober 2017).
https://doi.org/10.1139/cjce-2016-0509
-
Saad, Dina A. / Hegazy, Tarek (2015): Enhanced benefit–cost analysis for infrastructure fund allocation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 42, n. 2 (Februar 2015).
https://doi.org/10.1139/cjce-2014-0281