-
Saeed, Fam / Mostafa, Kareem / Rausch, Christopher / Hegazy, Tarek (2023): Environmental Impact and Cost Assessment for Reusing Waste during End-of-Life Activities on Building Projects. In: Journal of Construction Engineering and Management, v. 149, n. 10 (Oktober 2023).
https://doi.org/10.1061/jcemd4.coeng-12943
-
Mostafa, Kareem Tarek / Ojulari, Sayeeda / Hegazy, Tarek (2023): Enhanced Repetitive Scheduling Formulation for Meeting Deadlines and Resource Constraints in Linear and Scattered Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 März 2023).
https://doi.org/10.1139/cjce-2022-0029
-
Hegazy, Tarek / Saad, Dina A. (2013): A microeconomic perspective on infrastructure rehabilitation. In: Construction Management and Economics, v. 32, n. 5 (April 2013).
https://doi.org/10.1080/01446193.2013.879193
-
Bhih, Moneer / Hegazy, Tarek (2021): Enhanced Daily Windows Delay-Analysis Technique. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (August 2021).
https://doi.org/10.1061/(asce)la.1943-4170.0000475
-
Bhih, Moneer / Hegazy, Tarek (2020): Improving Concurrency Assessment and Resolving Misconceptions about But-For Delay Analysis Technique. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (Mai 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000378
-
Rashedi, Roozbeh / Hegazy, Tarek (2016): Holistic Analysis of Infrastructure Deterioration and Rehabilitation Using System Dynamics. In: Journal of Infrastructure Systems, v. 22, n. 1 (März 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000273
-
Hegazy, Tarek / Moselhi, Osama (1994): Estimator: a prototype of an integrated bid preparation system. In: Engineering, Construction and Architectural Management, v. 1, n. 1 (Januar 1994).
https://doi.org/10.1108/eb020992
-
Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina Atef (2014): Framework for enhanced progress tracking and control of linear projects. In: Engineering, Construction and Architectural Management, v. 21, n. 1 (Januar 2014).
https://doi.org/10.1108/ecam-08-2012-0080
-
Hegazy, Tarek / Mostafa, Kareem / Esnaashary Esfahani, Mansour (2020): Hands-On Class Exercise for Efficient Planning and Execution of Modular Construction. In: Journal of Civil Engineering Education, v. 146, n. 3 (Juli 2020).
https://doi.org/10.1061/(asce)ei.2643-9115.0000012
-
Hegazy, Tarek / Saad, Dina A. / Mostafa, Kareem (2020): Enhanced Repetitive-Scheduling Computation and Visualization. In: Journal of Construction Engineering and Management, v. 146, n. 10 (Oktober 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001911
-
Attalla, Mohamed / Hegazy, Tarek / Elbeltagi, Emad (2004): In-House Delivery of Multiple-Small Reconstruction Projects. In: Journal of Management in Engineering (ASCE), v. 20, n. 1 (Januar 2004).
https://doi.org/10.1061/(asce)0742-597x(2004)20:1(25)
-
Hegazy, Tarek / Elbeltagi, Emad (1999): EvoSite: Evolution-Based Model for Site Layout Planning. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (Juli 1999).
https://doi.org/10.1061/(asce)0887-3801(1999)13:3(198)
-
Hegazy, Tarek / Rashedi, Roozbeh (2013): Large-Scale Asset Renewal Optimization Using Genetic Algorithms plus Segmentation. In: Journal of Computing in Civil Engineering, v. 27, n. 4 (Juli 2013).
https://doi.org/10.1061/(asce)cp.1943-5487.0000249
-
Menesi, Wail / Golzarpoor, Behrooz / Hegazy, Tarek (2013): Fast and Near-Optimum Schedule Optimization for Large-Scale Projects. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000722
-
Hegazy, Tarek / Abdel-Monem, Mohamed / Saad, Dina A. / Rashedi, Roozbeh (2013): Hands-On Exercise for Enhancing Students' Construction Management Skills. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000705
-
Zaneldin, Essam / Hegazy, Tarek / Grierson, Donald (2001): Improving Design Coordination for Building Projects. II: A Collaborative System. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:4(330)
-
Hegazy, Tarek / Zaneldin, Essam / Grierson, Donald (2001): Improving Design Coordination for Building Projects. I: Information Model. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:4(322)
-
Mbabazi, Anania / Hegazy, Tarek / Saccomanno, Frank (2005): Modified But-For Method for Delay Analysis. In: Journal of Construction Engineering and Management, v. 131, n. 10 (Oktober 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1142)
-
Abdel-Monem, Mohamed / Hegazy, Tarek (2013): Enhancing Construction As-Built Documentation Using Interactive Voice Response. In: Journal of Construction Engineering and Management, v. 139, n. 7 (Juli 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000648
-
Hegazy, Tarek / Menesi, Wail (2012): Heuristic Method for Satisfying Both Deadlines and Resource Constraints. In: Journal of Construction Engineering and Management, v. 138, n. 6 (Juni 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000483
-
Elbeltagi, Emad / Hegazy, Tarek (2001): A Hybrid AL-Based System for Site Layout Planning in Construction. In: Computer-Aided Civil and Infrastructure Engineering, v. 16, n. 2 (März 2001).
https://doi.org/10.1111/0885-9507.00215
-
Hegazy, Tarek / Said, Mohamed / Kassab, Moustafa (2011): Incorporating rework into construction schedule analysis. In: Automation in Construction, v. 20, n. 8 (Dezember 2011).
https://doi.org/10.1016/j.autcon.2011.04.006
-
Elhakeem, Ahmed / Hegazy, Tarek (2005): Graphical Approach for Manpower Planning in Infrastructure Networks. In: Journal of Construction Engineering and Management, v. 131, n. 2 (Februar 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:2(168)
-
Hegazy, Tarek / Elbeltagi, Emad / Zhang, Kehui (2005): Keeping Better Site Records Using Intelligent Bar Charts. In: Journal of Construction Engineering and Management, v. 131, n. 5 (Mai 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:5(513)
-
Hegazy, Tarek / Petzold, Kevin (2003): Genetic Optimization for Dynamic Project Control. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:4(396)
-
Elbeltagi, Emad / Hegazy, Tarek / Grierson, Donald (2007): A modified shuffled frog-leaping optimization algorithm: applications to project management. In: Structure and Infrastructure Engineering, v. 3, n. 1 (März 2007).
https://doi.org/10.1080/15732470500254535
-
Rashedi, Roozbeh / Hegazy, Tarek (2016): Examining budget policies for new and existing facilities: a system dynamics approach. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 6 (Juni 2016).
https://doi.org/10.1139/cjce-2015-0486
-
Hegazy, Tarek / Menesi, Wail (2012): Enhancing the critical path segments scheduling technique for project control. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012).
https://doi.org/10.1139/l2012-024
-
Elbehairy, Hatem / Hegazy, Tarek / Soudki, Khaled (2009): Integrated Multiple-Element Bridge Management System. In: Journal of Bridge Engineering (ASCE), v. 14, n. 3 (Mai 2009).
https://doi.org/10.1061/(asce)1084-0702(2009)14:3(179)
-
Abuwarda, Zinab / Hegazy, Tarek (2016): Flexible Activity Relations to Support Optimum Schedule Acceleration. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001193