-
Abuwarda, Zinab / Mostafa, Kareem / Morita, Plinio / Hegazy, Tarek (2024): Optimizing Construction Work–Rest Schedules and Worker Reassignment Utilizing Wristband Physiological Data. In: Journal of Construction Engineering and Management, v. 150, n. 11 (November 2024).
https://doi.org/10.1061/jcemd4.coeng-14884
-
Ahmed, Hani / Mostafa, Kareem / Hegazy, Tarek (2024): Utilizing different artificial intelligence techniques for efficient condition assessment of building components. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 51, n. 4 (April 2024).
https://doi.org/10.1139/cjce-2023-0046
-
Abuwarda, Zinab / Mostafa, Kareem / Oetomo, Arlene / Hegazy, Tarek / Morita, Plinio (2022): Wearable devices: Cross benefits from healthcare to construction. In: Automation in Construction, v. 142 (October 2022).
https://doi.org/10.1016/j.autcon.2022.104501
-
Hegazy, Tarek / Kamarah, Ehab (2022): Schedule optimization for scattered repetitive projects. In: Automation in Construction, v. 133 (January 2022).
https://doi.org/10.1016/j.autcon.2021.104042
-
Attalla, Mohamed / Hegazy, Tarek / Haas, Ralph (2003): Reconstruction of the Building Infrastructure: Two Performance Prediction Models. In: Journal of Infrastructure Systems, v. 9, n. 1 (March 2003).
https://doi.org/10.1061/(asce)1076-0342(2003)9:1(26)
-
Hegazy, Tarek / Mostafa, Kareem / Ojulari, Saidat (2021): Tetris-inspired approach for generating tightly-packed repetitive schedules. In: Automation in Construction, v. 124 (April 2021).
https://doi.org/10.1016/j.autcon.2021.103601
-
Mostafa, Kareem / Hegazy, Tarek (2021): Review of image-based analysis and applications in construction. In: Automation in Construction, v. 122 (February 2021).
https://doi.org/10.1016/j.autcon.2020.103516
-
Hegazy, Tarek / Elhakeem, Ahmed / Singh Ahluwalia, Shipra / Attalla, Mohamed (2011): MOST-FIT: Support Techniques for Inspection and Life Cycle Optimization in Building Asset Management. Support techniques in building asset management. In: Computer-Aided Civil and Infrastructure Engineering, v. 27, n. 2 (August 2011).
https://doi.org/10.1111/j.1467-8667.2011.00729.x
-
Menesi, Wail / Hegazy, Tarek (2015): Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects. In: Journal of Management in Engineering (ASCE), v. 31, n. 6 (November 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000338
-
Hegazy, Tarek / Ali, Abdelbaset / Abdel-Monem, Mohamed (2011): Prospects of Mind Maps for Better Visualization of Infrastructure Literature. In: Journal of Professional Issues in Engineering Education and Practice, v. 137, n. 4 (October 2011).
https://doi.org/10.1061/(asce)ei.1943-5541.0000072
-
Abuwarda, Zinab / Hegazy, Tarek (2019): Multi-Dimensional Optimization Model for Schedule Fast-Tracking without Over-stressing Construction Workers. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 12 (December 2019).
https://doi.org/10.1139/cjce-2018-0544
-
McKim, Robert / Hegazy, Tarek / Attalla, Mohamed (2000): Project Performance Control in Reconstruction Projects. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:2(137)
-
Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1991): Neural Networks as Tools in Construction. In: Journal of Construction Engineering and Management, v. 117, n. 4 (December 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:4(606)
-
Hegazy, Tarek / Ersahin, Tolga (2001): Simplified Spreadsheet Solutions. II: Overall Schedule Optimization. In: Journal of Construction Engineering and Management, v. 127, n. 6 (December 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:6(469)
-
Hegazy, Tarek / Ersahin, Tolga (2001): Simplified Spreadsheet Solutions. I: Subcontractor Information System. In: Journal of Construction Engineering and Management, v. 127, n. 6 (December 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:6(461)
-
Hegazy, Tarek (1999): Optimization of Resource Allocation and Leveling Using Genetic Algorithms. In: Journal of Construction Engineering and Management, v. 125, n. 3 (June 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:3(167)
-
Hegazy, Tarek / Ayed, Amr (1998): Neural Network Model for Parametric Cost Estimation of Highway Projects. In: Journal of Construction Engineering and Management, v. 124, n. 3 (May 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:3(210)
-
Yousefi, Saied / Hegazy, Tarek / Capuruço, Renato A. / Attalla, Mohamed (2008): System of Multiple ANNs for Online Planning of Numerous Building Improvements. In: Journal of Construction Engineering and Management, v. 134, n. 5 (May 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:5(342)
-
Hegazy, Tarek / Kassab, Moustafa (2003): Resource Optimization Using Combined Simulation and Genetic Algorithms. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:6(698)
-
Attalla, Mohamed / Hegazy, Tarek (2003): Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:4(405)
-
Rashedi, Roozbeh / Hegazy, Tarek (2016): Strategic policy analysis for infrastructure rehabilitation using system dynamics. In: Structure and Infrastructure Engineering, v. 12, n. 6 (June 2016).
https://doi.org/10.1080/15732479.2015.1038723
-
Kassab, Moustafa / Hipel, Keith / Hegazy, Tarek (2011): Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. In: Structure and Infrastructure Engineering, v. 7, n. 9 (September 2011).
https://doi.org/10.1080/15732470802677649
-
Elbeltagi, Emad / Hegazy, Tarek / Hosny, Abdel Hady / Eldosouky, Adel (2001): Schedule-dependent evolution of site layout planning. In: Construction Management and Economics, v. 19, n. 7 (November 2001).
https://doi.org/10.1080/01446190110066713
-
Hegazy, Tarek (1999): Optimization of construction time-cost trade-off analysis using genetic algorithms. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 6 (December 1999).
https://doi.org/10.1139/l99-031
-
Hegazy, Tarek / Khalifa, Jameel / Zaneldin, Essam (1998): Towards effective design coordination: a questionnaire survey 1. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 3 (June 1998).
https://doi.org/10.1139/l97-115
-
Moselhi, Osama / Hegazy, Tarek / Fazio, Paul (1992): Potential applications of neural networks in construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 19, n. 3 (June 1992).
https://doi.org/10.1139/l92-061
-
Yousefi, Saied / Hipel, Keith W. / Hegazy, Tarek (2011): Optimum compromise among environmental dispute issues using attitude based negotiation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 2 (February 2011).
https://doi.org/10.1139/l10-125
-
Hegazy, Tarek / Elhakeem, Ahmed (2011): Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 3 (March 2011).
https://doi.org/10.1139/l10-134
-
Ali, Abdelbaset / Hegazy, Tarek (2014): Multicriteria Assessment and Prioritization of Hospital Renewal Needs. In: Journal of Performance of Constructed Facilities (ASCE), v. 28, n. 3 (June 2014).
https://doi.org/10.1061/(asce)cf.1943-5509.0000455
-
Hegazy, Tarek / Tully, Susan / Marzouk, Hesham: A neural network approach for predicting the structural behavior of concrete slabs. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 4.
https://doi.org/10.1139/l98-009