0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):

Medium: journal article
Language(s): English
Published in: Journal of Construction Engineering and Management, , n. 10, v. 136
Page(s): 1078-1085
DOI: 10.1061/(asce)co.1943-7862.0000212
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0000212.
  • About this
    data sheet
  • Reference-ID
    10165926
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine