0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Incorporating rework into construction schedule analysis

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , n. 8, v. 20
Page(s): 1051-1059
DOI: 10.1016/j.autcon.2011.04.006
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2011.04.006.
  • About this
    data sheet
  • Reference-ID
    10189996
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine