0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Nezhaddehghan, Mohammad / Ansari, Ramin / Banihashemi, Sayyid Ali (2023): An optimized hybrid decision support system for waste management in construction projects based on gray data: A case study in high-rise buildings. In: Journal of Building Engineering, v. 80 (December 2023).

    https://doi.org/10.1016/j.jobe.2023.107731

  2. Ashtari, Mohammad Amin / Ansari, Ramin / Hassannayebi, Erfan / Jeong, Jaewook (2022): Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach. In: Buildings, v. 12, n. 10 (20 September 2022).

    https://doi.org/10.3390/buildings12101660

  3. Ansari, Ramin / Dehghani, Parisa / Mahdikhani, Mahdi / Jeong, Jaewook (2022): A Novel Safety Risk Assessment Based on Fuzzy Set Theory and Decision Methods in High-Rise Buildings. In: Buildings, v. 12, n. 12 (1 December 2022).

    https://doi.org/10.3390/buildings12122126

  4. Ansari, Ramin / Khalilzadeh, Mohammad / Hosseini, M. Reza (2022): A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. In: KSCE Journal of Civil Engineering, v. 26, n. 3 (14 January 2022).

    https://doi.org/10.1007/s12205-021-0410-5

  5. Amin Ranjbar, Alireza / Ansari, Ramin / Taherkhani, Roohollah / Hosseini, M. Reza (2021): Developing a novel cash flow risk analysis framework for construction projects based on 5D BIM. In: Journal of Building Engineering, v. 44 (December 2021).

    https://doi.org/10.1016/j.jobe.2021.103341

  6. Alinezhad, Reza / Ansari, Ramin / Mahdikhani, Mahdi / Banihashemi, Sayyid Ali (2022): Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 3 (April 2022).

    https://doi.org/10.1007/s40996-021-00721-9

  7. Moradi, Shohreh / Ansari, Ramin / Taherkhani, Roohollah (2022): A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 1 (21 January 2022).

    https://doi.org/10.1007/s40996-021-00626-7

  8. Ansari, Ramin (2021): Dynamic Optimization for Analyzing Effects of Multiple Resource Failures on Project Schedule Robustness. In: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 March 2021).

    https://doi.org/10.1007/s12205-021-0564-1

  9. Abbasnezhad, Kiazad / Ansari, Ramin / Mahdikhani, Mahdi (2022): Schedule Risk Assessments Using a Precedence Network: An Object-Oriented Bayesian Approach. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (February 2022).

    https://doi.org/10.1007/s40996-020-00550-2

  10. Ansari, Ramin / Shakeri, Eghbal / Raddadi, Ali (2015): Framework for Aligning Project Management with Organizational Strategies. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000249

  11. Ansari, Ramin (2019): Dynamic Simulation Model for Project Change-Management Policies: Engineering Project Case. In: Journal of Construction Engineering and Management, v. 145, n. 7 (July 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001664

  12. Ghoddousi, Parviz / Ansari, Ramin / Makui, Ahmad (2016): A risk-oriented buffer allocation model based on critical chain project management. In: KSCE Journal of Civil Engineering, v. 21, n. 5 (August 2016).

    https://doi.org/10.1007/s12205-016-0039-y

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine