0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Arbabi, Alireza / Taherkhani, Roohollah / Ansari, Ramin: A novel approach for integrating BIM and green building rating systems in the construction projects design phase. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-03-2023-0200

  2. Pourdoustmohammadi, Sajjad / Ansari, Ramin: Developing a Scenario-Based Optimization Model for Planning Risks in Construction Projects by Integrating a Decision Support System with Bayesian Belief Network Analysis Approach: A Case Study in High-Rise Buildings. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering.

    https://doi.org/10.1007/s40996-024-01590-8

  3. Nezhaddehghan, Mohammad / Ansari, Ramin / Banihashemi, Sayyid Ali (2023): An optimized hybrid decision support system for waste management in construction projects based on gray data: A case study in high-rise buildings. Dans: Journal of Building Engineering, v. 80 (décembre 2023).

    https://doi.org/10.1016/j.jobe.2023.107731

  4. Ashtari, Mohammad Amin / Ansari, Ramin / Hassannayebi, Erfan / Jeong, Jaewook (2022): Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach. Dans: Buildings, v. 12, n. 10 (20 septembre 2022).

    https://doi.org/10.3390/buildings12101660

  5. Ansari, Ramin / Dehghani, Parisa / Mahdikhani, Mahdi / Jeong, Jaewook (2022): A Novel Safety Risk Assessment Based on Fuzzy Set Theory and Decision Methods in High-Rise Buildings. Dans: Buildings, v. 12, n. 12 (1 décembre 2022).

    https://doi.org/10.3390/buildings12122126

  6. Ansari, Ramin / Khalilzadeh, Mohammad / Hosseini, M. Reza (2022): A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. Dans: KSCE Journal of Civil Engineering, v. 26, n. 3 (14 janvier 2022).

    https://doi.org/10.1007/s12205-021-0410-5

  7. Amin Ranjbar, Alireza / Ansari, Ramin / Taherkhani, Roohollah / Hosseini, M. Reza (2021): Developing a novel cash flow risk analysis framework for construction projects based on 5D BIM. Dans: Journal of Building Engineering, v. 44 (décembre 2021).

    https://doi.org/10.1016/j.jobe.2021.103341

  8. Alinezhad, Reza / Ansari, Ramin / Mahdikhani, Mahdi / Banihashemi, Sayyid Ali (2022): Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 3 (avril 2022).

    https://doi.org/10.1007/s40996-021-00721-9

  9. Moradi, Shohreh / Ansari, Ramin / Taherkhani, Roohollah (2022): A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 1 (21 janvier 2022).

    https://doi.org/10.1007/s40996-021-00626-7

  10. Ansari, Ramin (2021): Dynamic Optimization for Analyzing Effects of Multiple Resource Failures on Project Schedule Robustness. Dans: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 mars 2021).

    https://doi.org/10.1007/s12205-021-0564-1

  11. Abbasnezhad, Kiazad / Ansari, Ramin / Mahdikhani, Mahdi (2022): Schedule Risk Assessments Using a Precedence Network: An Object-Oriented Bayesian Approach. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 46, n. 2 (février 2022).

    https://doi.org/10.1007/s40996-020-00550-2

  12. Ansari, Ramin / Shakeri, Eghbal / Raddadi, Ali (2015): Framework for Aligning Project Management with Organizational Strategies. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 4 (juillet 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000249

  13. Ansari, Ramin (2019): Dynamic Simulation Model for Project Change-Management Policies: Engineering Project Case. Dans: Journal of Construction Engineering and Management, v. 145, n. 7 (juillet 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001664

  14. Ghoddousi, Parviz / Ansari, Ramin / Makui, Ahmad (2016): A risk-oriented buffer allocation model based on critical chain project management. Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016).

    https://doi.org/10.1007/s12205-016-0039-y

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine