0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s40996-021-00721-9.
  • About this
    data sheet
  • Reference-ID
    10624711
  • Published on:
    26/08/2021
  • Last updated on:
    27/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine