0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach

This publication lists 35 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10624711
  • Published on:
    26/08/2021
  • Last updated on:
    27/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine