0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-021-0410-5.
  • About this
    data sheet
  • Reference-ID
    10646536
  • Published on:
    10/01/2022
  • Last updated on:
    17/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine