Advertisement

Share

Follow

Donate

North Arm Bridge

General Information

Completion: 14 August 2009
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Fraser River
Part of:
Coordinates: 49° 12' 8.84" N    123° 7' 4.05" W
Show coordinates on a map

Technical Information

Dimensions

main span 180 m
total length 562 m

Materials

deck precast prestressed concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Strong arm tactics. In: Bridge Update, n. 74 (March 2008), pp. 2.
  • Bergman, Don / Riley, Peggy (2008): Design of the North Arm Extradosed Bridge. Presented at: 17th IABSE Congress, Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, September 17-19, 2008.
  • About this
    data sheet
  • Structure-ID
    20043279
  • Date created
    02/02/2009
  • Last Update
    05/02/2016