• de
  • en
  • fr
  • International Database and Gallery of Structures

Busan-Geoje Fixed Link

General Information

Other name(s): Geoga Bridge
Beginning of works: 2004
Completion: 13 December 2010
Status: in use

Project Type

Function / usage: Road connection

Location

km Name

Technical Information

Dimensions

total length 8 204.4 m
number of lanes 2 x 2

Participants

Design
Contractor

Relevant Web Sites

Relevant Publications

  • Fraser, Don / Kyoon Jeong, Sang (2010): Full exposure. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 28-30.
  • Final stretch. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 8.
  • Fraser, Don (2008): Vision on. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 32-33.
  • Masterton, Iain (2006): Three-part story. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 24.
  • About this
    data sheet
  • Structure-ID
    10000609
  • Date created
    16/11/2004
  • Last Update
    19/01/2016