• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Busan-Geoje Bridge (I)

General Information

Completion: 13 December 2010
Status: in use

Project Type

Location

Location: ,
Part of:
Coordinates: 35° 0' 53.70" N    128° 45' 15.22" E

Technical Information

Dimensions

main span 475.0 m
length of side spans 220.0 m

Products, Services & Reports

Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions ...

[more]

Participants

Design
Wind tunnel testing
Expansion joints

Relevant Web Sites

Relevant Publications

  • Fraser, Don / Kyoon Jeong, Sang (2010): Full exposure. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 28-30.
  • Joo, Seok-Jun / Kim, Dae-Young / Kim, Young-Min / Kim, Yun-Seok / Kwak, Young-Hak: TMD Method of Construction for the Cable Stayed Bridge in the Environmentally Constrained Areas. Presented at: IABSE Symposium, Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, 22-24 September 2010, pp. 222.
  • Final stretch. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 8.
  • Fraser, Don (2008): Vision on. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 32-33.
  • Legs on track. In: Bridge Update, n. 80 (December 2008), pp. 2.
More publications...
  • About this
    data sheet
  • Structure-ID
    20014427
  • Date created
    16/11/2004
  • Last Update
    05/02/2016