General Information
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Construction method: |
New Austrian Tunnelling Method (NATM) Drilling and blasting |
Structure: |
Tunnel |
Location
Location: |
Terfens, Tyrol, Austria Vomp, Tyrol, Austria |
---|---|
Part of: | |
Connects to: |
Tunnel Stans-Terfens (2012)
|
Coordinates: | 47° 17' 42.90" N 11° 33' 45.53" E |
Technical Information
Dimensions
total length | 7 735 m | |
number of tracks | 2 | |
number of tubes | 1 | |
eastern tube | length | 3 991 m |
tunnel section area | 108 - 205 m² | |
emergency access tube | length | 4 970 m |
tunnel section area | 45 - 60 m² | |
western tube | length | 3 744 m |
tunnel section area | 129 - 144 m² |
Cost
construction cost (without tax) | Euro 175 000 000 |
Participants
Owner
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Eisenbahntunnel Vomp-Terfens. In: Beton- und Stahlbetonbau, v. 101, n. 12 (December 2006), pp. 942.
- Der Tunnel Vomp/Terfens - von der Variantenstudie bis zur Bauausführung. In: Felsbau, v. 23, n. 1 ( 2005), pp. 83. (2005):
- About this
data sheet - Structure-ID
20025317 - Published on:
19/11/2006 - Last updated on:
28/05/2021