General Information
Completion: | 1976 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching with temporary cable-stays |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Poitiers, Vienne (86), Nouvelle-Aquitaine, France |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Next to: |
Viaduc sur la vallée de la Boivre (1970)
|
Coordinates: | 46° 34' 19.32" N 0° 17' 20.67" E |
Technical Information
Dimensions
total length | 286.4 m | |
span lengths | 35.7 m - 5 x 43 m - 35.7 m | |
number of spans | 7 | |
pier height | 13.5 - 34 m | |
pier height | 15 - 29 m | |
deck | deck depth | 2.50 m |
deck width | 13.55 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
prestressed concrete
|
Notes
This is the first bridge in France built using the incremental launching method.
Participants
Owner
Concessionaire
Client
Construction engineers
Contractor
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le savoir faire français en matière d'ouvrages d'art. French know-how in bridge building. ISTED, Paris (France), pp. 184-185.
- About this
data sheet - Structure-ID
20005548 - Published on:
27/09/2002 - Last updated on:
05/02/2016