General Information
Status: | in use |
---|
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Le Luc, Var (83), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 43° 23' 46.57" N 6° 18' 50.42" E |
Technical Information
Dimensions
total length | 2 x 278.5 m | |
span lengths | 37.5 m - 5 x 40.7 m - 37.5 m | |
number of spans | 7 | |
pier height | 11.3 - 31 m | |
deck | deck depth | 3.15 m |
deck width | 2 x 14.45 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Luc - A8 - Viaduc du Luc. In: Bulletin annuel AFPC ( 1973- 1974), pp. 120-123.
- Le savoir faire français en matière d'ouvrages d'art. French know-how in bridge building. ISTED, Paris (France), pp. 158-159.
- Le Viaduc du Luc. In: Chantiers de France, n. 53 (September 1972).
- About this
data sheet - Structure-ID
20005547 - Published on:
27/09/2002 - Last updated on:
05/02/2016