General Information
Completion: | 10 February 1978 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
La Trinité, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc des Vignasses (1985)
|
Coordinates: | 43° 44' 20" N 7° 19' 29.16" E |
Technical Information
Dimensions
total length | 258 m | |
span lengths | 68 m - 122 m - 68 m | |
number of spans | 3 | |
pier height | max. 51 m | |
web thickness | 0.40 m | |
deck | deck depth | 3.0 - 7.5 m |
deck width | 12.40 m | |
average depth | 0.85 m |
Quantities
deck | prestressing steel | 32 kg/m² |
reinforcing steel | 128 kg/m² |
Materials
deck |
prestressed concrete
|
---|
Chronology
10 February 1978 | Opened to traffic. |
---|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducs du contournement autoroutier de Nice. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 172-180. (1978):
- About this
data sheet - Structure-ID
20004633 - Published on:
22/08/2002 - Last updated on:
30/07/2019