General Information
Completion: | 1985 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
La Trinité, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc des Vignasses (1978)
|
Coordinates: | 43° 44' 20.62" N 7° 19' 28.24" E |
Technical Information
Dimensions
total length | 258 m | |
span lengths | 68 m - 122 m - 68 m | |
number of spans | 3 | |
pier height | max. 51 m | |
web thickness | 0.40 m | |
deck | deck depth | 3.0 - 7.5 m |
deck width | 11.40 m |
Quantities
concrete volume | 2 533 m³ | |
prestressing steel | 135 t | |
reinforcing steel | 329 t |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Doublement du viaduc des Vignasses. In: Travaux, n. 606 (January 1986), pp. 78.
- About this
data sheet - Structure-ID
20007603 - Published on:
05/01/2003 - Last updated on:
30/07/2019