General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Saint-Isidore Viaduct (1986)
|
Coordinates: | 43° 42' 33" N 7° 11' 42" E |
Technical Information
Dimensions
total length | 228.87 m | |
span lengths | 39.3 m - 4 x 40.1 m - 28.17 m | |
number of spans | 6 | |
pier height | max. 25 m | |
number of lanes | 3 | |
total width | 13.5 m | |
deck | deck depth | 2.50 m |
deck width | 12.5 m | |
deck slab thickness | 0.20 - 0.25 m | |
web thickness | 0.35 m | |
thickness of bottom flange | 0.13 - 0.24 m | |
average depth | 0.56 m |
Quantities
deck | prestressing steel | 20 kg/m² |
Materials
deck |
prestressed concrete
|
---|
Chronology
December 1976 | Opened to traffic. |
---|
Participants
Owner
Client
Structural engineering
Main contractor
Contractor
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Comment élargir un viaduc dit «non élargissable». Cas du viaduc de Saint-Isidore sur l'autoroute A8. In: Travaux, n. 722 (July - August 1996), pp. 49-56. (1996):
- Viaducs du contournement autoroutier de Nice. Presented at: La technique française du béton. 8ème congrès FIP. Londres 1978 (AFB/AFGC), pp. 172-180. (1978):
- About this
data sheet - Structure-ID
20004639 - Published on:
22/08/2002 - Last updated on:
05/02/2016