General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction with temporary cable-stays |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nice, Alpes-Maritimes (06), Provence-Alpes-Côte d'Azur, France |
---|---|
Carries: |
|
Part of: | |
Next to: |
Viaduc de la Banquière (1976)
|
Coordinates: | 43° 44' 0.88" N 7° 17' 6.78" E |
Technical Information
Dimensions
total length | 110.50 m | |
span lengths of first bridge | 34.59 m - 42.92 m - 38.69 m | |
span lengths of second bridge (southern box girder) | 29.407 m - 32.551 m - 22.024 m | |
span lengths of second bridge (northern box girder) | 39.25 m - 30.875 m - 19.718 m | |
deck | deck depth | 2.50 m |
deck width | 10.40 - 25.82 m | |
average volume (western deck) | 7.25 m³/m | |
average volume (eastern deck) | 12.28 m³/m | |
piers | height | max. 19 m |
Quantities
deck | prestressing steel | 77.7 kg/m² |
reinforcing steel | 172.2 kg/m² |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A8 - Viaduc de la Banquière (doublement contournement de Nice). In: Bulletin annuel AFPC ( 1980- 1982), pp. 197-202.
- La construction à l'avancement par haubanage provisoire. Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 212-219. (1982):
- Viaduc de la Banquière (doublement du contournement de l'A8 à Nice). Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 68.
- Viaducs autoroutiers en sites difficiles: contraintes de conception et de réalisation (A40 et A8). Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 233-241. (1982):