General Information
Other name(s): | Gino Papuli Footbridge |
---|---|
Completion: | Summer 2017 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Steel bridge |
Structure: |
main bridge: Two-span cable-stayed bridge main bridge: Cable-stayed bridge with semi-fan system |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
secondary span: Bowstring-arch-truss bridge |
Location
Technical Information
Dimensions
width | 5.40 m | |
total length | 180 m | |
pylon | height | 60 m |
secondary span | span | 55 m |
main bridge | ||
---|---|---|
length | 125 m | |
span lengths | 54.8 m - 41.9 m | |
number of spans | 2 |
Materials
pylon |
steel
|
---|
Participants
Owner
Architecture
Structural design
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- (2017): Tripod Footbridge, Terni (Italy). The Bridge as a Public Realm Driver of Urban Regeneration. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- (2017): "Tripod" Footbridge in Terni (Italy): On site Dynamic Characterization and Numerical Investigation of Lock-In. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- (2017): Wind Tunnel Tests and Full-Scale Measurements on a Cable-Stayed Footbridge. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- About this
data sheet - Structure-ID
20072395 - Published on:
08/01/2017 - Last updated on:
18/06/2022