0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Donaubrücke Traismauer
Beginning of works: 2007
Completion: 2011
Status: in use

Project Type

Awards and Distinctions

2013 entry  

Location

Location: , ,
Crosses:
  • Danube
See also: Marktwasserbrücke S33.24 (2010)
Coordinates: 48° 23' 5.33" N    15° 43' 17.16" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 150 m
northern approach viaduct total length 460 m
southern approach viaduct total length 330 m
main bridge
total length 360 m
span lengths 100 m - 160 m - 100 m
number of spans 3

Quantities

concrete volume 55 000 m³
reinforcing steel 7 000 t
water proofing 36 000 m²
internal prestressing 621 t
external prestressing 170 t

Materials

deck prestressed concrete

Case Studies and Applied Products

TENSA®FINGER GF – Sliding Finger joints

TENSA®FINGER GF – Sliding Finger joints

The mageba GF Sliding Finger Construction is a robust Finger Expansion Joint for high requirements with regard to moveability (up to 1,000 mm), riding comfort and durability.

[more]
TENSA®FINGER RSFD – Cantilever finger joints

TENSA®FINGER RSFD – Cantilever finger joints

The RSFD Cantilever Finger Joint consists of massive steel edge profiles with finger plates that are connected to the lower construction on either side of the bridge gap.

[more]

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049124
  • Published on:
    24/11/2009
  • Last updated on:
    29/01/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine