General Information
Other name(s): | River Suir Bridge |
---|---|
Beginning of works: | April 2006 |
Completion: | 19 October 2009 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Structure: |
Two-span cable-stayed bridge |
Material: |
Steel-reinforced concrete composite bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Waterford, County Waterford, Ireland County Kilkenny, Ireland |
---|---|
Crosses: |
|
Coordinates: | 52° 16' 42.32" N 7° 9' 4.54" W |
Technical Information
Dimensions
main span | 230 m | |
length | 465 m | |
span lengths | 42.0 m - 66.5 m - 91.5 m - 230.0 m - 35.0 m | |
number of spans | 5 | |
number of lanes | 2 x 2 | |
deck | total width | 30.60 m |
roadway / carriageway width | 2 x (10.50 - 13.50 m) | |
deck of main span | on-center distance between girders | 25.60 m |
pylon | height | 112.80 m |
Quantities
deck | structural steel | 2 900 t |
concrete volume | 3 553 m³ | |
reinforcing steel | 925 t | |
piers | concrete volume | 545 m³ |
pylon | concrete volume | 4 379 m³ |
stay cables | steel for cable-stays | 436 t |
Materials
pylon |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
deck of main bridge |
composite steel-reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
ROBO®CONTROL Permanent – Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed and they are made available to the clients through internet.
[more]TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Chronology
April 2006 | Beginning of works. |
---|---|
19 October 2009 | Opened. |
Participants
Design
Wind tunnel testing
Contractor
Steel construction
Precastor
Foundations
Stay cables
Prestressing
Expansion joints
Construction supervision
Relevant Web Sites
Relevant Publications
- Dealing with dynamics. When Ireland's new River Suir Bridge opens to traffic next year, the dynamic behavirous of certain cables will be kept under permanent scrutiny. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009), pp. 56. (2009):
- The Design of the River Suir Bridge in Waterford, Ireland. In: Structural Engineering International, v. 21, n. 1 (February 2011), pp. 61-64. (2011):
- El puente atirantado sobre el río Suir en Waterford. In: Hormigón y acero, v. 62, n. 262 (4th Quarter 2011), pp. 7-37. (2011):
- Puente atirantado sobre el río Suir en Waterford (Irlanda). Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- Smooth Suir. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 70.
- About this
data sheet - Structure-ID
20019004 - Published on:
10/01/2006 - Last updated on:
05/02/2016