General Information
Completion: | 12 December 2021 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span extradosed bridge |
---|---|
Support conditions: |
for registered users |
Construction method: |
Balanced cantilever method |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Tramway, light or metro rail bridge |
Material: |
upper deck: Prestressed concrete bridge |
Function / usage: |
lower deck: Bicycle and pedestrian bridge |
Material: |
lower deck: Steel bridge |
Location
Location: |
Edmonton, Alberta, Canada |
---|---|
Crosses: |
|
Coordinates: | 53° 32' 24.53" N 113° 28' 37.75" W |
Technical Information
Dimensions
main span | 110 m | |
span lengths | 100 m - 110 m - 50 m | |
lower deck | deck depth | 0.40 m |
deck width | 8.00 m | |
pier | number | 1 |
pylon | number | 1 |
upper deck | deck depth | 3.50 m |
deck width | 11 m | |
number of tracks | 2 | |
track gauge | 1 435 mm |
Materials
pylon |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
upper deck |
prestressed concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2019): Tawatinâ Bridge - An Extradosed Rail and Pedestrian Bridge. Presented at: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, pp. 2314-2321.
- About this
data sheet - Structure-ID
20086885 - Published on:
10/09/2023 - Last updated on:
10/09/2023