New Tappan Zee Bridge
General Information
Other name(s): | Governor Mario M. Cuomo Bridge |
---|---|
Beginning of works: | 2013 |
Completion: | 15 June 2018 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Tarrytown, Westchester County, New York, USA Nyack, Rockland County, New York, USA |
---|---|
Crosses: |
|
To replace: |
Governor Malcolm Wilson–Tappan Zee Bridge (1955)
|
Coordinates: | 41° 4' 0.47" N 73° 51' 59.67" W |
Coordinates: | 41° 4' 28.36" N 73° 55' 11.48" W |
Technical Information
Dimensions
main span | 365.76 m | |
horizontal navigation clearance | 347.47 m | |
pylons | height | 127.71 m |
Materials
piers |
reinforced concrete
|
---|---|
girders |
steel
|
Products, Services & Reports

The mageba Shock Transmission Unit (STU) is designed to be connected between bridge structure components to form a rigid link under dynamic loads i ...
[more]
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions ...
[more]Chronology
26 August 2017 | The westbound span is opened to traffic. |
---|---|
6 October 2017 | Eastbound traffic is moved from the old bridge to the westbound span of the new bridge to allow demolition to begin. |
Participants
Owner
Co-contractor
Steel construction
Expansion joints
Shock absorbers
Relevant Web Sites
Relevant Publications
- Tappan Zee Bridge replacement unveiled. In: Bridge Update, n. 79 (October 2008), pp. 4.
- About this
data sheet - Structure-ID
20043320 - Date created
02/02/2009 - Last Update
16/11/2017