General Information
Official designation: | A7 BW 16-1 (7626662 1/2) |
---|---|
Beginning of works: | 23 May 1972 |
Completion: | 4 March 1976 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Double T-section girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Prestressed concrete bridge |
Location
Location: |
Senden, Neu-Ulm (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Carries: |
A 7 Motorway (Germany)
|
Coordinates: | 48° 19' 3" N 10° 5' 29" E |
Technical Information
Dimensions
total length | 196 m | |
main spans | 36.2 m | |
span lengths | 30.1 m - 3 x 36.2 m - 30.2 m - 27.1 m | |
number of spans | 6 | |
deck | width | 15.50 m; 15.50 -19.80 m |
girder depth | 1.50 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Initial construction (1972-1976)
Owner
Client
Design
Structural engineering
Checking engineering
-
Gerhart und Menzinger
- J. Menzinger (checking engineer)
Contractor
Prestressing bars
Recalculation to current codes (2012-2013)
Client
Structural engineering
Checking engineering
-
Konstruktionsgruppe Bauen AG, Kempten
- Norbert Nieder (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20065555 - Published on:
31/07/2013 - Last updated on:
05/02/2016