Beginning of works: 1934
Completion: 27 February 1936
Status: destroyed (1945)

Project Type

Location

Location: , , ,
Part of:
Replaced by: Sulzbach Viadukt (1954)
Carried: A 8 Motorway (Germany)

Technical Information

Dimensions

total length 388 m
span lengths 40.00 m - 52.30 m - 58.00 m - 63.80 m - 58.00 m - 52.20 m - 40.60 m
number of spans 7
deck length 365.40 m
total width 19.90 m
main girders on-center distance between girders 13.00 m
piers width 14.900 m

Quantities

bearings structural steel 230 t
deck slab structural steel 600 t
foundations & abuments concrete volume 5800 m³
reinforcing steel 100 t
main girders structural steel 1 000 t
piers structural steel 700 t

Design Loads

live load Brückenklasse I
design code(s) DIN 1072

Cost

cost of construction Reichsmark 2 500 000

Materials

piers steel
foundations reinforced concrete
deck slab steel
reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008548
  • Published on:
    10/03/2003
  • Last updated on:
    09/03/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine