General Information
Other name(s): | Talbrücke Schwarzbachtal |
---|---|
Official designation: | 5315/04 |
Beginning of works: | 1997 |
Completion: | 1999 |
Duration of works: | 23 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Gräfenroda, Ilm-Kreis, Thuringia, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Connects to: |
Alte Burg Tunnel (2002)
|
Coordinates: | 50° 42' 58.28" N 10° 47' 46.44" E |
Technical Information
Dimensions
bridge surface | 9 099 m² | |
height above valley floor or water | max. 71 m | |
deck | deck depth | 3.25 m |
deck width | 2 x 13.50 m | |
Northern bridge | ||
---|---|---|
total length | 352 m | |
span lengths | 35 m - 6 x 47 m - 35 m | |
number of spans | 8 | |
Southern bridge | ||
total length | 322 m | |
span lengths | 35 m - 5 x 45 m - 35 m - 27 m | |
number of spans | 8 |
Quantities
concrete volume | 8 750 m³ | |
prestressing steel | 225 t | |
reinforcing steel | 1 400 t |
Cost
cost of construction | German Mark 21 000 000 | |
cost of construction per m² | German Mark 2 300 |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
prestressed concrete
|
Participants
Owner
Client
Structural engineering
Checking engineering
Contractor
Construction supervision
Relevant Web Sites
Relevant Publications
- Besondere Brücken II. Dokumentation 2000. Berlin (Germany).
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 139-144.
- Leistungsfähige Fernstraßen für den Osten Deutschlands - Der Ausbau des Autobahnnetzes in den neuen Bundesländern. In: Baukultur, n. 3 ( 2000), pp. 6-8. (2000):
- About this
data sheet - Structure-ID
20000332 - Published on:
13/08/1999 - Last updated on:
05/02/2016