General Information
Other name(s): | Claudia-Tunnel |
---|---|
Official designation: | 5315/03 |
Beginning of works: | 1998 |
Completion: | 2002 |
Duration of works: | 47 months |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
New Austrian Tunnelling Method (NATM) |
Location
Location: |
Geschwenda, Ilm-Kreis, Thuringia, Germany |
---|---|
For: |
|
Part of: | |
Connects to: |
Schwarzbachtal Viaduct (1999)
|
Coordinates: | 50° 43' 1.45" N 10° 48' 40.74" E |
Coordinates: | 50° 42' 58.86" N 10° 47' 55.32" E |
Technical Information
Dimensions
clearance | 4.50 m | |
on-axis distance between tubes | 25 m (min. 23.6 m) | |
crossing tubes | number | 2 |
northern tube | length | 874 m |
southern tube | length | 866 m |
Quantities
concrete volume | 27 300 m³ | |
volume of extracted material | 160 000 m³ |
Cost
cost of construction | German Mark 50 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Client
Design
Structural engineering
Architectural consulting
- Ralf Schüler (architectural consultant)
- Ursulina Schüler-Witte (architectural consultant)
Checking engineering
- Manfred Baudendistel (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2004. Deutscher Bundes-Verlag, Berlin (Germany), 2004, pp. 141-166.
- About this
data sheet - Structure-ID
20000852 - Published on:
08/08/2000 - Last updated on:
28/05/2021