General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Abbeville, Somme (80), Hauts-de-France, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 50° 7' 24" N 1° 51' 33" E |
Technical Information
Dimensions
total length | 1 022 m | |
span lengths | 32.20 m - 19 x 50.40 m - 32.20 m | |
number of spans | 21 | |
pier height | max. 30 m | |
deck | deck depth | 3.50 m |
deck width | 19.20 m |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Owner
Client
Design
- Michel Placidi (designer)
Architecture
- Jean-Vincent Berlottier (architect)
Structural engineering
Consulting engineers
- Jean Tonello (consulting engineer)
Main contractor
Subcontractor
Foundations
Prestressing
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A16. Les viaducs du Boulonnais et du Scardon. Présentation de l'ensemble des projets. Presented at: , pp. 261-270. :
- Les fondations du viaduc du Scardon. Conception et contrôle. In: Travaux, n. 753 (May 1999), pp. 42-47. (1999):
- Taktschiebebrücken in Mischbauweise am Beispiel der Talbrücke Scherenbusch. Vergleich mit weiteren aktuellen Bauwerken im In- und Ausland. In: Beton- und Stahlbetonbau, v. 98, n. 4 (April 2003), pp. 209-216. (2003):
- Viaduc de Scardon. Le contournement d'Abbeville par l'autoroute A16. In: Travaux, n. 754 (July 1999), pp. 52-56. (1999):
- Le viaduc du Scardon. In: Formes et Structures (4th Quarter 1996), pp. 29-30. (1996):
- About this
data sheet - Structure-ID
20003247 - Published on:
15/05/2002 - Last updated on:
07/12/2023