0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Taktschiebebrücken in Mischbauweise am Beispiel der Talbrücke Scherenbusch

Vergleich mit weiteren aktuellen Bauwerken im In- und Ausland

Author(s):


Medium: journal article
Language(s): German
Published in: Beton- und Stahlbetonbau, , n. 4, v. 98
Page(s): 209-216
DOI: 10.1002/best.200301160
Abstract:

Incrementally launched Bridges with combined internal and external Post-Tensioning.
Incremental launching of prestressed concrete bridges is known to be a very cost effective construction method, even now after the general regulation to incorporate external tendons into box girders in Germany. This applies in particular in case of the superstructure being prestressed from both internal tendons during construc- tion and additional external tendons for the final state of the superstructure. By using the recently completed road bridge Scherenbusch as an example, the construction method is generally discussed and consequently compared with two other new viaducts of the same type. Finally, a brief comparison with international examples is being performed and the possible influence resulting from future changes in the codes is pointed out.

Keywords:
external prestressing
Available from: Refer to publisher

Structures and Projects

Structure Types

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/best.200301160.
  • About this
    data sheet
  • Reference-ID
    10011990
  • Published on:
    08/12/2003
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine