General Information
Name in local language: | Viaducto de Sant Bartomeu |
---|---|
Beginning of works: | 1995 |
Completion: | 1996 |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 337.00 m | |
span lengths | 50 m | |
span lengths | 43.50 m - 5 x 50.70 m - 40.00 m | |
number of spans | 7 | |
horizontal radius of curvature | 650 m | |
pier height | max. 48 m | |
deck | deck depth | 2.80 m |
deck width | 13.10 m | |
number of lanes | 2 | |
longitudinal slope | 4.2 % | |
superelevation | 7.3 % |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
-
Estudio de Ingeniería y Proyectos
- José Antonio Llombart (designer)
- Jordi Revoltós (designer)
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducto de Sant Bartomeu, perteneciente al eje transversal Lleida-Girona. In: Hormigón y acero, v. 50, n. 212 (2nd Quarter 1999), pp. 43-50. (1999):
- About this
data sheet - Structure-ID
20008446 - Published on:
02/03/2003 - Last updated on:
30/12/2016