General Information
Status: | in use |
---|
Project Type
Structure: |
Pony truss bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Structure: |
Warren type truss bridge Bowstring-arch-truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Riudellots de la Selva, Girona, Catalonia, Spain |
---|---|
Coordinates: | 41° 53' 59.42" N 2° 46' 28.27" E |
Technical Information
Dimensions
span lengths | 2 x 53.00 m | |
number of spans | 2 | |
skew | 34° | |
number of tracks | 2 | |
on-center distance between girders | 14.00 m | |
arches | rise | 7.60 m |
deck | deck slab thickness | 0.60 m |
piles | diameter | 1.25 m |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Technical advisor to the owner
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puente de la línea de alta velocidad Barcelona - frontera francesa sobre la AP-7 en Riudellots de la Selva. In: Hormigón y acero, v. 62, n. 261 (3rd Quarter 2011), pp. 55-67. (2011):
- (2010): Riudellots High Speed Line Bridge. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 808-809.
- About this
data sheet - Structure-ID
20058456 - Published on:
03/10/2010 - Last updated on:
20/11/2016