0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Wehretalbrücke Reichensachsen
Beginning of works: 2016
Completion: 2019
Status: under construction

Project Type

Location

Location: , , ,
Part of:
Coordinates: 51° 8' 44.14" N    9° 58' 58.68" E
Show coordinates on a map

Technical Information

Dimensions

main bridge
total length ca. 668.60 m
span lengths 30.0 m - 2 x 43.00 m - 55.10 m - 67.50 m - 56.00 m - 8 x 43.00 m - 30.00 m
number of spans 15
deck deck depth 1.97 - 3.77 m
deck width 15.60 m
total width 16.55 m
ramp
deck deck width 9.60 m
deck width 1.42 m
ramp BW C21/16A
total length 154.00 m
span lengths 23.00 m - 26.00 m - 30.00 m - 30.00 m - 45.00 m
number of spans 5

Cost

cost of construction ca. Euro 20 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20076431
  • Published on:
    30/11/2018
  • Last updated on:
    30/11/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine