General Information

Other name(s): Mainbrücke Randersacker
Beginning of works: June 2007
Completion: July 2011
Duration of works: 50 months
Status: in use

Project Type

Function / usage: Motorway bridge / freeway bridge
Structure: Girder bridge
Construction method: Span-by-span in-situ casting on falsework
Material: Prestressed concrete bridge
Construction method: main bridge:
Balanced cantilever method

Location

Location: , , ,
Carries:
  • Autobahn A3
Crosses:
  • Main River
Part of:
Replaces: Randersacker Bridge (1964)
Coordinates: 49° 44' 19.25" N    9° 59' 9.96" E
Show coordinates on a map

Technical Information

Dimensions

main span 140 m
total length 540 m
span lengths 57.5 m - 81 m - 140 m - 81 m - 71 m - 61 m - 48.5 m
number of spans 7
bridge surface 21 481 m²
height above valley floor or water max. 16 m
girder depth 4.00 - 7.50 m
deck deck width 39.78 m

Quantities

deck concrete volume 21 000 m³
prestressing steel 990 t
reinforcing steel 3 450 t
substructure concrete volume 12 300 m³
reinforcing steel 1 200 t

Cost

cost of construction Euro 35 000 000

Materials

deck prestressed concrete

Case Studies and Applied Products

A bridge bearing for different construction stages

A bridge bearing for different construction stages

The lateral shifting of the bridge in February was the visible highlight for the new Randersacker Bridge. However, the working horses of that structure are the sliding bearings. They demonstrate their performance in construction mode, in de ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043635
  • Published on:
    17/02/2009
  • Last updated on:
    17/09/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine