General Information
Project Type
Function / usage: |
Department store |
---|
Location
Location: |
Cologne, North Rhine-Westphalia, Germany |
---|---|
Address: | Schildergasse |
Coordinates: | 50° 56' 9.30" N 6° 57' 10.04" E |
Technical Information
There currently is no technical data available.
Case Studies and Applied Products
RESTON®SDD – Spring Disc Dampers
mageba RESTON®SDD Spring Disc Dampers consist of a steel tube containing a piston and a stack of disc springs. The disc springs deform under pressure from the piston, damping its movement. The system offers excellent reliability and dura ... [more]
Participants
Owner
Architecture
Structural engineering
- Knippers Helbig GmbH (façade)
- KREBS+KIEFER Ingenieure GmbH (concrete)
Checking engineering
- KREBS+KIEFER Ingenieure GmbH
- Dan Constantinesci (checking engineer)
General contractor
Spring dampers
Building physics
Fire safety engineering
Specialist consultants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Fassadenentwicklung Kaufhaus Peek und Cloppenburg, Köln. In: Glas, v. 12, n. 1 ( 2006), pp. 46. (2006):
- Ingenieurbaukunst in Deutschland. Jahrbuch 2005/2006. Junius Verlag GmbH, Hamburg (Germany), ISBN 9783885065630, 2005, pp. 42-47.
- Transparentes Weltstadtkaufhaus. Der neue Peek & Cloppenburg in Köln. In: [ Umrisse ], v. 5, n. 6 ( 2005), pp. 30-35. (2005):
- Ein Walfisch aus Stahl, Holz und Glas - Die Fassade des Kaufhauses Peek und Cloppenburg in Köln. In: Stahlbau, v. 74, n. 11 (November 2005), pp. 803-808. (2005):
- Weltstadthaus Peek & Cloppenburg, Köln. Überbauung einer Hauptverkehrsader, Maßnahmen zur Anpassung des Rohbautragwerks an veränderte Randbedingungen. In: Beton- und Stahlbetonbau, v. 100, n. 9 (September 2005), pp. 812-821. (2005):
- About this
data sheet - Structure-ID
20016896 - Published on:
17/07/2005 - Last updated on:
28/07/2015