0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Paryeong Bridge

Structurae currently has catalogued 3 relevant publication(s) listed below.

  1. Kim, Jungin / Chung, Kusang / Yoon, Jahgeol / Lee, Sangchul (2014): Erection of Catwalk Rope and Main Cable of Jeokgeum Bridge. Presented at: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, pp. 692-699.

    https://doi.org/10.2749/222137814814066807

  2. Choi, Hyun-Sok / Cho, Ho-Jin / Lee, Kyoungjae / Kim, Jaehong (2011): Planning of construction sequence for suspension bridge by analysis and simulation. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011.
  3. Kim, Jaehong / Lee, Minjae / Kim, Jungin / Choi, Jinhyuk (2015): The Recent Cable and Deck Erection Methods Applied in Various Types of Suspension Bridges in Korea. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 608-615.

    https://doi.org/10.2749/222137815818357674