0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Jeokguem Bridge; Palyeong Bridge
Beginning of works: November 2004
Completion: 27 December 2016
Status: in use

Project Type

Location

Location: ,
Coordinates: 34° 37' 51.52" N    127° 29' 45.03" E
Coordinates: 34° 37' 52.60" N    127° 30' 38.22" E
Coordinates: 34° 37' 52.90" N    127° 30' 10.99" E
Show coordinates on a map

Technical Information

Dimensions

main span 850 m
width 19.7 m
total length 1 340 m
span lengths 50 m - 4 x 65 m - 850 m - 3 x 60 m
number of spans 9
number of lanes 2
deck girder depth 3.0 m
pylons height 133.3 m

Materials

cables steel
deck steel
piers reinforced concrete
pylons reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20062076
  • Published on:
    10/10/2011
  • Last updated on:
    18/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine