Erection of Catwalk Rope and Main Cable of Jeokgeum Bridge
|
Bibliographic Details
Author(s): |
Jungin Kim
Kusang Chung Jahgeol Yoon Sangchul Lee |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 692-699 | ||||
Total no. of pages: | 8 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814066807 | ||||
Abstract: |
Jeokgeum Bridge is one of the ongoing suspension bridge projects as a follow-up of Yi Sun-sin Bridge. Jeokgeum Bridge had adopted the same construction method for its main cable as the Yi Sun-sin Bridge, and the most of the equipment and the acquired techniques were applied again to Jeokgeum Bridge. Therefore, the most of the cable erection procedures were similar to Yi Sun-sin Bridge, however, there were several unique features and two of them are introduced in this paper:
|
||||
Keywords: |
suspension bridge suspender main cable catwalk erection spread control
|