Paryeong-Brücke
-
Kim, Jungin / Chung, Kusang / Yoon, Jahgeol / Lee, Sangchul (2014): Erection of Catwalk Rope and Main Cable of Jeokgeum Bridge. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, S. 692-699.
https://doi.org/10.2749/222137814814066807
-
Choi, Hyun-Sok / Cho, Ho-Jin / Lee, Kyoungjae / Kim, Jaehong (2011): Planning of construction sequence for suspension bridge by analysis and simulation. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011.
-
Kim, Jaehong / Lee, Minjae / Kim, Jungin / Choi, Jinhyuk (2015): The Recent Cable and Deck Erection Methods Applied in Various Types of Suspension Bridges in Korea. Vorgetragen bei: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, S. 608-615.
https://doi.org/10.2749/222137815818357674