Planning of construction sequence for suspension bridge by analysis and simulation
Autor(en): |
Hyun-Sok Choi
Ho-Jin Cho Kyoungjae Lee Jaehong Kim |
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011 |
Veröffentlicht in: | IABSE-IASS 2011 London Symposium Report |
Jahr: | 2011 |
Abstrakt: |
Through the 3-D construction sequence analysis considering the behaviour of suspension bridge under construction, the girder erection sequence of suspension bridge is optimized and the construction error can be minimized. Also, the planning of lifting devices’ operation can be completed in advance. |