General Information

Beginning of works: 1996
Completion: 1 July 2000
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Øresund
Part of:
Coordinates: 55° 35' 21.02" N    12° 46' 35.39" E
Coordinates: 55° 33' 55.87" N    12° 53' 33.26" E
Show coordinates on a map

Technical Information

Dimensions

main span 490 m
total length 7 845 m
suspended length 1092 m
clearance 57 m
deck width 23.5 m
pylon pylon height 203.5 m

Quantities

structural steel 82 000 t
concrete volume 320 000 m³
reinforcing steel 60 000 t
steel for cable-stays 2 300 t

Materials

superstructure steel
substructure reinforced concrete
pylons reinforced concrete

Case Studies and Applied Products

RESTON®POT – Pot Bearings

RESTON®POT – Pot Bearings

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.

[more]

Chronology

14 August 1999

The last span is lifted into place, Prince Frederik of Denmark and Princess Victoria of Sweden exchange kisses on the bridge.

1 July 2000

Opened for traffic across the link.

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000333
  • Published on:
    15/08/1999
  • Last updated on:
    29/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine