General Information
Other name(s): | Oberkasseler Dauerbehelfsbrücke |
---|---|
Beginning of works: | 1947 |
Completion: | 1948 |
Status: | demolished (1973) |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Tramway, light or metro rail bridge Road bridge |
Structure: |
Warren type truss bridge Continuous truss bridge |
Material: |
Steel bridge |
Location
Location: |
Düsseldorf-Altstadt, Düsseldorf, North Rhine-Westphalia, Germany Düsseldorf-Oberkassel, Düsseldorf, North Rhine-Westphalia, Germany |
---|---|
Crossed: |
|
Part of: | |
Replaces: |
Freeman Bridge (1945)
|
Replaced by: |
Oberkassel Bridge (1976)
|
Coordinates: | 51° 13' 53.79" N 6° 46' 5.62" E |
Technical Information
Dimensions
span lengths | 4 x 90 m | |
number of spans | 4 | |
deck | deck width | 8.20 m |
Materials
truss |
steel
|
---|
Chronology
8 May 1948 | First tramway passes over the bridge |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Architekten und Ingenieure gestalten ihre Stadt. 100 Jahre Architekten- und Ingenieurverein (AIV). Richter-Verlag, Düsseldorf (Germany), 1993, pp. 102.
- Düsseldorf: eine Stadt zwischen Tradition und Vision. Brücken über den Rhein. B.o.s. Druck und Medien, Kleve (Germany), pp. 322. (2001):
- About this
data sheet - Structure-ID
20000327 - Published on:
07/08/1999 - Last updated on:
05/02/2016