General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Location
Location: |
Chatham, Medway, Kent, South East England, England, United Kingdom |
---|---|
Part of: | |
Coordinates: | 51° 20' 41.69" N 0° 30' 2.61" E |
Coordinates: | 51° 18' 59.85" N 0° 30' 42.85" E |
Technical Information
Dimensions
diameter | 12.8 m | |
tunnel length | 3 200 m |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Design
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 17,000 m MAI type Hollow Core Anchors deep beneath Downtown London. In: DSI Info, n. 10 ( 2001- 2002), pp. 15.
- 17.000 m de tirants auto-forants à injection simultanée sous le centre de Londres. In: DSI Info, n. 10 ( 2001- 2002), pp. 15.
- 17.000 m DYWIDAG-Injektionsbohranker in London. In: DSI Info, n. 10 ( 2001- 2002), pp. 15.
- Bored tunnels. In: The Arup Journal, v. 39, n. 1 ( 2004), pp. 22-28. (2004):
- Channel Tunnel Rail Link section 1: North Downs tunnel. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 156, n. 6 (November 2003), pp. 40-48. (2003):
- About this
data sheet - Structure-ID
20001524 - Published on:
14/07/2001 - Last updated on:
28/05/2021