General Information

Beginning of works: 2020
Completion: February 2023
Status: in use

Project Type

Location

Location: , ,
Coordinates: 34° 51' 49.76" S    150° 36' 3.36" E
Show coordinates on a map

Technical Information

Dimensions

length 359.7 m
horizontal radius of curvature 328.000 m
standard span lengths 38.5 m
number of lanes 2
roadway / carriageway width 15.000 m
walkway width 3.500 m
abutments number 2
deck deck depth 2.71 m
number of longitudinal girders 2
pile caps thickness 2.100 m
piles diameter 1.500 m

Materials

deck prestressed concrete
piers reinforced concrete
piles reinforced concrete
steel tubes
abutments reinforced concrete

Excerpt from Wikipedia

The Nowra Bridge is a road bridge that carries the Princes Highway over the Shoalhaven River, at Nowra, New South Wales, Australia. The bridge joins the main area of Nowra to North Nowra and Bomaderry.

Description

Despite popular mythology, the bridge was not originally intended to carry a double railway track, as part of the proposed extension of the Illawarra railway line to Jervis Bay and possibly Eden.

The bridge was designed by American engineer Charles Shaler Smith and is considered to be of local historical significance. The bridge was completed in 1881 and is built from wrought iron with a steel approach span. The bridge had a timber deck for 100 years until in 1981 reinforced concrete was laid over steel Armco decking. The pairs of cast iron piers are original and were supplied locally by the Atlas Foundry, Sydney. It was the largest bridge project in New South Wales prior to the 1889 Hawkesbury River Railway Bridge. Its full length is 342 metres (1,122 ft).

Second bridge

In December 1981, a three lane concrete bridge opened to the west of the original bridge. It carried northbound traffic with the original bridge reconfigured to carry southbound traffic.

Third bridge

In August 2019 Infrastructure Australia approved the construction of a new four-lane bridge immediately to the west of the existing bridges. The new bridge will become the new crossing for northbound traffic. The existing northbound bridge will be converted for southbound traffic, allowing the bridge built in 1881 to be re-purposed as a pedestrian and cycle bridge. Funding to be shared between the Federal and New South Wales governments. Fulton Hogan commenced work in early 2020 and is expected to be completed in 2024. In February 2023 the new bridge opened, initially carrying traffic in both directions while the 1981 built bridge is refurbished.

Text imported from Wikipedia article "Nowra Bridge" and modified on September 5, 2024 according to the CC-BY-SA 4.0 International license.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20089261
  • Published on:
    03/09/2024
  • Last updated on:
    03/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine