0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Medway Crossing
Completion: 2003
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , , ,
Crosses:
  • Medway River
Part of:
Next to: Medway Viaduct (M-2) (2003)
Coordinates: 51° 22' 33" N    0° 28' 28" E
Show coordinates on a map

Technical Information

Dimensions

main span 152 m
total length 1 256 m
clearance 25 m
deck deck depth 3.23 - 11.50 m
deck width 12.25 m
approach viaducts
length 384 m
554 m

Materials

deck prestressed concrete

Chronology

December 2001

Structural works completed.

2003

Expected opening to traffic.

Notes

Approach viaducts are constructed using the incremental launching method.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001309
  • Published on:
    11/02/2001
  • Last updated on:
    21/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine