General Information
Other name(s): | Medway Crossing |
---|---|
Completion: | 2003 |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Awards and Distinctions
2002 |
for registered users |
---|
Location
Location: |
Medway, Kent, South East England, England, United Kingdom |
---|---|
Crosses: |
|
Part of: | |
Next to: |
Medway Viaduct (M-2) (2003)
|
Coordinates: | 51° 22' 33" N 0° 28' 28" E |
Technical Information
Dimensions
main span | 152 m | |
total length | 1 256 m | |
clearance | 25 m | |
deck | deck depth | 3.23 - 11.50 m |
deck width | 12.25 m | |
approach viaducts | ||
---|---|---|
length | 384 m 554 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
December 2001 | Structural works completed. |
---|---|
2003 | Expected opening to traffic. |
Notes
Approach viaducts are constructed using the incremental launching method.
Participants
Owner
Client
Architecture
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- CTRL: liaison ferroviaire à grande vitesse entre Londres et le tunnel sous la Manche. Lot 350/410: le viaduc sur la Medway. In: Travaux, n. 781 (December 2001), pp. 26-31. (2001):
- Design of Medway Viaduct for Channel Tunnel Rail Link (CTRL). Presented at: IABSE Symposium: Structures for High-Speed Railway Transportation, Antwerp, Belgium, 27-29 August 2003, pp. 96-97. (2003):
- Fast track to Europe. In: Bridge Design & Engineering, v. 6, n. 21 (4th Quarter 2000), pp. 38-40. (2000):
- Vermessungstechnische Lösungen auf den Baustellen North Downs Tunnel und Brücke Medway Crossing – Hochgeschwindigkeitstrasse von London zum Eurotunnel. In: Bauingenieur, v. 79, n. 6 (June 2004). (2004):
- About this
data sheet - Structure-ID
20001309 - Published on:
11/02/2001 - Last updated on:
21/04/2016