0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Vermessungstechnische Lösungen auf den Baustellen North Downs Tunnel und Brücke Medway Crossing – Hochgeschwindigkeitstrasse von London zum Eurotunnel

Author(s):

Medium: journal article
Language(s): German
Published in: Bauingenieur, , n. 6, v. 79
Abstract:

This paper explains that the application of modern measurement technology becomes more and more important in tunnelling and bridge construction. New sensors increase the accuracy and reduce conventional staff intensive measuring concepts. The interaction of planning, basis measurement and the building concurrent measurements is currently decisive for smooth operation during these engineering projects.

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015467
  • Published on:
    21/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine