0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1901
Completion: 13 August 1902
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Isar River
Part of:
Coordinates: 48° 8' 57" N    11° 35' 54.64" E
Show coordinates on a map

Technical Information

Dimensions

arch clear distance ca. 63 m
deck deck width 18.10 m

Cost

cost of construction ca. Mark 930 000

Materials

arch stone
veneer stone

Chronology

7 November 1901

Construction begins

13 August 1902

Opening to traffic

Participants

Design
Architecture
Construction
Renovation
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001017
  • Published on:
    01/10/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine